Heraklion International Nikos Kazantzakis Airport

NOTAM feed refreshed just now

LGIR · Heraklion 6 NOTAMs

METAR age 11 min ago Observed 20:20Z
TAF remaining 21 h 29 min left Valid 18:00Z → 18 18:00Z
Weather now VFR · 16°C · 160° at 10 kt · 2026-11-17 20:20 UTC METEO → Watch LGIR Get an email when a NOTAM at LGIR is issued, changed or cancelled — free while in beta. START FREE →

Nearby aerodromes

  • 4019/2026 QMRLT Caution

    Runway limitation

    INTERSECTION TAKE OFFS RWY 09/27 ARE SUSPENDED. REF AIP GREECE AD 2 LGIR AD 2.13 AND AD 2.22.8

    From 2026-10-30 13:05 UTC To 2027-01-31 21:59 UTC
  • 4252/2026 QFAAR Caution

    Aerodrome available, prior permission required

    FOLLOW-ME CAR GUIDANCE AVAILABLE ONLY UPON REQ BY PILOT OR ATC.

    From 2026-11-16 13:00 UTC To 2027-03-15 21:59 UTC
  • 4211/2026 QOBCE Info

    Runway 27 raised

    PORT CRANES 8-9 RAISED. REF AIP AD2-LGIR-AOC A-2 CRANE 8: OBSTACLE HEIGHT 73M/AMSL CRANE 9: OBSTACLE HEIGHT 65M/AMSL CRANES MOVING 700-1200 M FROM RWY 27 END AND 180-540 M NORTH OF CENTERLINE RWY 09/27. IN CASE IT IS NECESSARY TO LOWER THE CRANES, FOR OPERATIONAL REASONS, A 30 MINS PRIOR NOTICE IS REQUIRED

    From 2026-11-16 06:00 UTC To 2026-11-18 20:00 UTC
  • 4236/2026 QOLAS Info

    Obstacle unserviceable

    OBSTACLE LIGHT NO6 (ST NIKOLAS CHURCH) U/S. REF. AIP GREECE AD2-LGIR-AOC A-2.

    From 2026-11-17 00:00 UTC To 2026-12-02 23:59 UTC
  • 3862/2026 QFWAS Info

    Runway 09 unserviceable

    WIND DIRECTION INDICATOR RWY 09 U/S

    From 2026-10-16 18:24 UTC To 2027-01-16 18:00 UTC
  • 4106/2026 QLBAS Info

    Notice unserviceable

    AERODROME BEACON ABN U/S. REF AIP GREECE LGIR AD 2.15.

    From 2026-11-04 14:17 UTC To 2027-02-04 21:59 UTC
METEO Current METAR and TAF for LGIR Briefing Filter by zone, get alerts and a compliance PDF

Source: FAA Notice to Air Missions (NMS), archived by NOTAMET. Re-used under Law 37/2007. See the disclaimer below.

Rather not check by hand? We email you when a notice lands at the aerodromes you follow — see what that email carries · 30 days free.