Chongqing Jiangbei International Airport

NOTAM feed refreshed just now

ZUCK · Chongqing 3 NOTAMs +9 starting within 24 h

METAR age 56 min ago Observed 13:00Z
TAF remaining 22 h 04 min left Valid 12:00Z → 23 12:00Z
Weather now VFR · 14°C · 10° at 4 kt · 2026-11-22 13:00 UTC METEO → Watch ZUCK Get an email when a NOTAM at ZUCK is issued, changed or cancelled — free while in beta. START FREE →

Nearby aerodromes

3 of 10 notices match this filter.

  • 3099/2026 QMXLC Critical

    Taxiway closed

    FLW TWY CLSD DUE TO MAINT: 1.TWY Z1 BTN TWY C9 AND TWY C. 2.TWY Z1 BTN TWY D3 AND TWY D.

    From 2026-06-28 13:05 UTC To 2026-11-29 22:00 UTC
  • 5088/2026 QMXLC Critical

    Taxiway closed

    FLW TWY CLSD DUE TO WIP: 1.TWY B SOUTH OF TWY A1. 2.TWY B1,B4 CLSD WEST OF RWY02L/20R. 3.TWY B2,B3 .

    From 2026-11-04 22:01 UTC To 2026-12-14 08:00 UTC
  • 4913/2026 QMOXX Info

    Taxiway G

    STOP BAR LIGHTS OPERATION VERIFICATION IMPLEMENT WI AREA EAST OF TWY G, STOP BAR LIGHTS OPERATION RULES: 1. ACFT SHALL CROSS STOP BAR LIGHTS WHEN ALL CONDITIONS ARE MET: 1.1 RECEIVE THE INSTRUCTION TO ENTER OR CROSS RWY. 1.2 THE STOP BAR LIGHTS IS OFF. 1.3 TWY CL LIGHTS ARE ILLUMINATED (GREEN AND YELLOW). 2. IF ABOVE THREE CONDITIONS ARE NOT MET AT THE SAME TIME, ACFT PILOT SHALL CONTACT ATC TO CONFIRM AND FOLLOW THE ATC INSTRUCTION.

    From 2026-10-23 02:43 UTC To 2026-11-30 10:00 UTC
METEO Current METAR and TAF for ZUCK Briefing Filter by zone, get alerts and a compliance PDF

Source: FAA Notice to Air Missions (NMS), archived by NOTAMET. Re-used under Law 37/2007. Operational terms.

Rather not check by hand? We email you when a notice lands at the aerodromes you follow — see what that email carries · 30 days free.